Applications:
1. Brazing: Ideal for brazing a wide range of cutting tools including diamond circular saws (diameters from 300 to 2500 mm), abrasive tools, drilling bits, alloy blades, hard alloy cutters, milling cutters, reamers, and solid center bits. The process typically takes between 9 to 15 seconds per diamond blade.
2. Heat Treatment: Suitable for heat treating small components.
3. Melting: Capable of melting up to 2 kg of gold, silver, copper, brass, steel, and iron.
4. Forging
5. Hardening
6. Quenching
7. Annealing
Model | Input Power | Frequency | Input Voltage | Duty Cycle | Heating Current | Retaining Current | Time Control | Size (CM)/Weight |
GHF-30B | 30KW | 30-80KHZ | 380V, 415V, 440V, 50/60Hz, three-phase | 100% | 10-70A | Â | Â | Generator: 60x26x50 / 28KG | Transformer: 47x27x40 / 26KG |
GHF-30AB | 30KW | 10-70A | 1–99s | |||||
GHF-40B | 40KW | 10-90A | Â | Â | Generator: 60x26x50 / 36KG | Transformer: 47x27x40 / 33KG | |||
GHF-40AB | 40KW | 10-90A | 1–99s | |||||
GHF-50B | 50KW | 10-105A | Â | Â | Generator: 60x26x50 / 40KG | Transformer: 51x27x40 / 39KG | |||
GHF-50AB | 50KW | 10-105A | 1–99s | |||||
Cable length from generator to transformer is 2 meters, max 6 meters |
A: 1. Our factory has over 15 years of experience in manufacturing induction heating systems, providing expert-level solutions tailored to your needs.
2. We offer large-scale production capacity and flexible customization, including packaging options based on your requirements.
3. We use only 100% new materials and strictly control the entire production process, resulting in a defect rate below 0.01%.
A: Typically 5–10 days if in stock, or 15–20 days if not in stock, depending on the quantity ordered.
A: 12 months.
Silica Aerogel Powders,Silica Aerogel Thermal Insulation Coating,Aerogel Incorporated Plasters And Mortars,Aerogel Insulating Plaster
Henan Minmetals East New Materials CO. LTD. , https://www.eastmaterials.com