Filler MasterBatch Granulating Machine With Plastic Recycled PP/PE Â
Machine Size | Screw Diameter(mm) | L/D | Screw Speed Max.(rpm) |
Motor power(Kw) | Torque per shaft(Nm) | Specific torque T/A3 |
Throughput rate(kg/h) |
ATE35 | 35.6 | 32-64 | 600 | 15 | 115 | 4.2 | 40-80 |
ATE52 | 51.4 | 32-64 | 600 | 55 | 415 | 5.2 | 150-250 |
ATE65 | 62.4 | 32-64 | 600 | 90 | 675 | 4.8 | 200-400 |
ATE75 | 71 | 32-64 | 600 | 132 | 990 | 4.6 | 300-700 |
ATE95 | 93 | 32-64 | 600 | 315 | 2365 | 5 | 550-1500 |
Engineering plastics |
Masterbatch |
Filling |
TPE/TPR/TRV |
Direct extrusion |
1. Technical documents
All labels on ATE Twin Screw Extruder and lay-out drawings, Electrical diagram, User Manual, will be in English. We should send all necessary files to the buyer since the third week since project execution. All documents in hard copies should be also shipped with machines together2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
Â
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD100 per day for each engineer.
Âd. Engineer will give free training lessons to labors in buyer's factory.
Â3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the pp pe pellets production system at port of destination. We will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
Âb. Guarantee period and after-sales services: 12months since installation finished in buyer's factory
During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
Âc. Long-term service:
We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide
Packaging Details: | Film and wood as internation sea shippment standard for whole pp pe plastic pellets production system |
Delivery Detail: | 60 working days before delivery |
Â
You can find both stainless steel over center buckles and zinc-plated over center buckles at WinnerLifting.
Each over center buckle has its own special way to work with straps,to lock and to get your attension.
There are around 15 popular buckles in the market,and it's been years.Why change the good thing?Said by the people who use these buckles.
Plus,WinnerLifting is happy to provide buckle with straps,PP or PE both fine.
You can always find a practical solution for your inquiry here.
Overcenter Buckle,Stainless Steel Overall Buckle,Over Center Bar Buckle,Zinc Steel Buckle
WINNERLIFTING(H.K.)INT'L TRADING LIMITED. , https://www.massagebeds.nl